Delivery of 2 sets stainless c channel roll forming machine On Sep.10,2024 Inspection System Before Shipment Double-Check Machine 1. Test Machine Running Situation Test the machine again to make sure machine in good performance and final sheet can match with the signed profile drawing. 2. Make Sure All Components are Ready Follow up all machine components whether are ready according to the contract.Make sure 100% complete when client get the machine. 3. Prepare for Shippment Measure the machine length,work out container size and quantity. Help to give client economic way to ship the machine.